Hussung Mechanical provided the mechanical, plumbing and medical gas systems for the 290,000 sq ft Baptist Hospital East – Patient Tower Addition and Renovation project. The new addition includes 144 private patient rooms, eight operating suites, pre and post-operating rooms, administrative areas, and an eight-bed post anesthesia care unit (PACU).
Hussung Mechanical installed five custom built air handling units, two 460 ton chillers, five hot water boilers, new cooling tower, pumps, clean steam generator, steam-fired domestic water heater, medical gas equipment, and plumbing fixtures. Through close coordination with the construction team and owner, we were able to complete all tie-ins to existing systems seamlessly and without compromise to patient care.